Check Heat Pump Grant

Independent. Not affiliated with GOV.UK, Ofgem, MCS or any installer.

Why hybrid heat pumps are excluded

A hybrid keeps a boiler in the system alongside a heat pump. The grant pages say that combination is not funded.

Key takeaways

  • Installing a hybrid is not eligible.
  • Replacing an old fossil hybrid with a full heat pump can still be a grant category, usually at the standard amount.
  • The checker returns “not eligible” when you say you want a hybrid.

What hybrid means here

GOV.UK gives the example of a gas boiler combined with an air source heat pump. The boiler remains part of the heating system. That is the arrangement the scheme refuses.

Some quotes use “hybrid” for a heat pump that can also cool, or for a system with a backup heater inside the heat pump. Ask the installer whether a boiler or other fossil appliance stays connected. The word on the brochure is less useful than that answer.

Replacing an old hybrid

The values notice does include rows for replacing a fossil fuel hybrid system. For an air-to-water or ground source heat pump those rows are £7,500, not £9,000. The new system still has to be the heat pump on its own, not another hybrid.

If your current heating is oil or LPG only, without a second fossil appliance left in place, look at the off-gas pages. The checker’s heating list does not use “hybrid” as a current fuel. Tell the installer if a second appliance is still there.

What the checker does

If you choose hybrid as the system you want, the result is not eligible. It does not offer a partial grant. Change the answer to a full heat pump if that is what you are actually buying.

This is a guide, not a decision. Your installer applies and Ofgem decides.

Reviewed by

Edward Thomson

Edward Thomson

MCIBSEHeat pump retrofits since 2005

UK Heat Pump & Funding Specialist

MCIBSE and MCS certified retrofit specialist. Director of Thomson and Sons Low Carbon Consulting Firm Ltd, specialising in heat pump retrofits since 2005.

Figures updated: Content reviewed: October 2026Independent. Not affiliated with GOV.UK, Ofgem, MCS or any installer.